Important Dates

  • Week of September 27, 2021 Surveys mailed out to all district residents 

  • Surveys must be completed by October 18, 2021

  • Survey results will be reported out at the November 15, 2021 School Board Meeting.

Facility Needs Analysis and Feasibility Study

The Tomorrow River School District Board of Education is currently working on a comprehensive Facility Needs Analysis and Feasibility Study.  The Board hired Hoffman Construction Company out of Appleton, WI, to assist them with this process.  The goal of this facility study is to develop a long-range facilities/site plan and to update the academic plan.  This also ties into the long-range strategic plan and vision for the district which was developed in 2019.

The TRSD is working with School Perceptions LLC, an independent firm with expertise in conducting community surveys. A comprehensive survey will be mailed to all district residents (this survey will also be available online) during the week of September 27, 2021 asking for input on any future potential building renovation and expansion needs. The survey will also be asking district residents if they are willing to support any future building referendum. Final survey results will be reported out at the November 15, 2021 School Board Meeting. 

Colored Map of construction